East Project – NordEst Logistic Park


NORDEST LOGISTIC PARK is located on the North Eastern segment of the Bucharest ring road.
The site lies at 1.5 km from the junction of the ring road with DN 2 Bucharest – Urziceni road, at 7.5 km from the A2 highway Bucharest – Constanta and at 4 km from the future Bucharest – Brasov highway. The center of Bucharest may be reached in 30 minutes driving time while Henri Coanda international airport lies within 20 minutes driving time.


    


GENERAL TECHNICAL DESCRIPTION

• Steel frame structure with sandwich panel walls
• Column spacing – 8m x 26m (dc1) and 17m x 24m (dc2 & dc3)
• Clear height: 10m
• Floor load 50kn/m2
• Floor din line 3 standard flatness
• Esfr sprinkler system
• Ample car & truck parking areas
• 3 loading docks per warehouse unit
• 1 drive-in ramp per warehouse unit
• 14-16°c temperature during winter time
• Power station on site
• Waste water treatment plant
• Storm water drainage
• Connection to telecommunications
• Professional property management
• 24 h security


AVAILABLE IN PHASE II

Unit 1: Warehouse: 3,068 sq m / Office: 506.9 sq m
Unit 2: Warehouse: 2,079 sq m / Office: 170.8 sq m
Unit 3: Warehouse: 3,184 sq m / Office: 213 sq m
Total Warehouse: 8,331 sq m / Total Office: 890.70 sq m


COMMERCIAL KEY FIGURES

Rent Warehouse: 4,1 EUR/sq m
Rent Offices: 7.5 EUR/sq m
Service Charge: 0.75 EUR/sq m
Lease Term: 5 years
Availability: October 2019
Indexation: EU-CPI, yearly


BUILD TO SUIT OFFERS

Share