South-East Project – CATALUNYA PARK


CATALUNYA LOGISTIC PARK will be a quality industrial complex located very close to the Bucharest Ring Road. Close to the main communications of the country offer the advantage of a quiet area but a few meters from the main axis of communication of the city and the country. The current construction of the overpass between the Ring Road and the DN4 will make circulation and access to the area one of the most practical in Bucharest.

Surrounded by the main distribution and business centers, this industrial park brings its tenants closer to an emerging country that is constantly being modernized and expanded, making it a privilege to enjoy these facilities.

Main structure of reinforced concrete, office attachments with metal structure, concrete enclosures and insulated sheet, make CATALUNYA LOGISTIC PARK an ideal place to set up your business.


  


GENERAL DATA

  • 10 industrial B-type modules dedicated to deposit of aprox. 1.250 sq.m on ground and from 25 to 250 sq.m of offices.
  • 2 industrial A-type moduls dedicated to deposit of approx. 1.250 sq.m on ground and from 300 to 800 sq.m of offices spread over 2 floors. Facade exclusive to the DN4.
  • 1.000 sq.m per nave diaphanous without intermediate pillars.
  • 129 parking spaces inside the site and exteriors.
  • 7.279 qm.m of green area.
  • 17 m platform width and 10.5 m wide road, make circulation and maneuverability comfortable.
  • Fully buried and adapted facilities.
  • ISU approval for the required fire category.

NOTE: The modularity of the modules allows to join more than one if necessary. The surfaces are approximate and vary slightly in each case.


Execution of works – Phase 2 – In progress

   

 


TECHNICAL FEATURES

  • Precast reinforced concrete pillars and metal trusses with 25 m of light.
  • Independent metal structure for support of attics.
  • Detached concrete floor.
  • Exterior coating by double lacquered sheet metal with fiberglass insulation.
  • Lacquered sheet metal cover with thermal insulation.
  • Interior lighting through skylights.
  • Forged with mixed structure (cooperating sheet and concrete).
  • Inner free height in an area of more than 7 m.
  • Service bathrooms on ground floor.
  • Center of access stairs to attics.
  • Rush of services.

AVAILABILITY

The project is structured in 3 phases with the following terms:

PHASE 1:
Completed – Rented.
PHASE 2:
Construction three modules available starting December 2018.
PHASE 3:
In the project – delivery at the end of 2019


 

Surfaces:

1.250 sqm warehouse
1.253 sqm warehouse
1.290 sqm warehouse + 386 sqm offices


BUILD TO SUIT OFFERS