The complex is located in the south-eastern part of the capital, just a few hundred meters from the current Ring Road and within 1 km of the next ring roads.
Complexul este localizat in partea de sud-est a capitalei, la doar cateva sute de metri de actuala Sosea de Centura si la maximum 1 km de inelul viitoarei sosele de centura.
* Useful height: 10 meters * 4 x 4.5 m access doors; * Drive-in access doors * Loading / unloading docks (adjustable ramps – 6T) * The floor load of 5.000kg / sqm * Building designed for fire resistance class C (ESFR hydrants and sprinkler system) * 150-lux ground lighting system * 380V electric power – 7.2 MW installed power for the entire premises * Parking for trucks and the area for handling them * Sewage treatment plant * Closed-circuit video surveillance cameras and 24-hour security |
* inaltime utila: 10 metri * usi acces 4 x 4,5 m; * usi acces drive-in * dock-uri incarcare/ descarcare (rampe ajustabile – 6T) * sarcina suportata de pardoseala 5.000kg/mp * cladire proiectata pentru Clasa C de rezistenta la foc (sistem de hidranti si sprinklere ESFR) * sistem de iluminare cu putere de 150lux la nivelul solului * energie electrica 380V – putere instalata 7,2 MW pentru toata incinta * parcare pentru camioane si zona pentru manevrarea acestora * statie de epurare a apei reziduale * camere supraveghere video cu circuit inchis si paza 24 ore |
Availability: There are currently no available surfaces within this project. |
Disponibilitate: Momentan in cadrul acestui proiect nu sunt suprafete disponibile. |